Technics: | Hot Forging |
---|---|
Standard: | IEC |
Usage: | Substation Fittings, Line Fittings |
Samples: |
Electric Line Fastening Yoke Plates
|
---|
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
HE Code | Description | Dimensions | Bolt dia. | Min failing load | |
A | B | Kn | |||
DP-1 | Double plates | 8 | 20 | 16 | 70 |
DP-2 | Double plates | 8 | 20 | 16 | 120 |
DP-3 | Double plates | 10 | 24 | 20 | 160 |
1. Tolerance: ±5% | |||
2. All dimensions are in MM except for marked. | |||
3. Finish: steel hot dip galvanized per ASTM A153 | |||
4. Customized sizes are available at request. | |||
3.Product Description:
The above are typical only, please consult Shanghai Herrajes for further information. |
|||
4.Product Details: | |||
Name: double plates, double plate link, strain plate clevis, guy link assemblies, double clevis | |||
HS code: 7326 | |||
Model: | |||
Package: bulk packing; palletized; as required | |||
Trademark: HE, as required | |||
Origin: China | |||
Raw material: malleable cast iron, steel, copper, stainless steel | |||
Finish: hot dip galvanized | |||
ODM&OEM service: yes | |||
Sample: available, FOC | |||
Payment term: T/T, 30% prepayment and 70% balance against B/L | |||
Certificate: ISO | |||
Delivery time: 20-40 days | |||
MOQ: 500kgs | |||
Export term: FOB; CIF | |||
Production capacity pcs/day: 2000 | |||
Minimum failing load kN: 70 Length MM: ≥76 Bolt dia. MM: 16, 20,etc. |
Suppliers with verified business licenses