Technics: | Injection Molding |
---|---|
Standard: | IEC |
Usage: | Substation Fittings, Line Fittings |
Samples: |
Power Line Gear Secondary Racks
|
---|
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
HE Code |
SPB11/16 |
Notes: 1. Tolerance: ±5% 2. All dimensions are in mm. |
|||||||
3. Material: carbon steel | |||||||
4. Finish: hot dip galvanized | |||||||
5. Customized sizes are available at request. | |||||||
3.Product Description:
|
|||||||
4.Product Details: | |||||||
Name: side post brackets, insulator side brackets, side post insulator brackets, post insulator mounting brackets | |||||||
HS code: 7326 | |||||||
Model: CSA | |||||||
Package: bulk packing; palletized; as required | |||||||
Trademark: HE, as required | |||||||
Origin: China | |||||||
Raw material: ductile iron | |||||||
Finish: hot dip galvanized according with ASTM A153 | |||||||
ODM&OEM service: yes | |||||||
Sample: available, FOC | |||||||
Payment term: T/T, 30% prepayment and 70% balance against B/L | |||||||
Certificate: ISO | |||||||
Delivery time: 20-40 days | |||||||
MOQ: 500kgs | |||||||
Export term: FOB; CIF | |||||||
Production capacity pcs/day: 2000 | |||||||
Minimum tensile strength lbs.: | |||||||
Mounting hole dia. mm: 17.5 Slot dia. mm: 17.5×35 Steel size mm: 9.5 x 76 |
|||||||
Weight kg: |
Suppliers with verified business licenses